Skip to product information
Vesgantti 88.4' Sleeper Sectional Couch with Pull Out Bed, 5 Seater L Shaped Modular Sectional Sofa with Storage, Comfy Corduroy Modular Sofa for Living Room, Bedroom, Apartment, Light Coffee
Sale price
$301.96
Regular price $759.99
Features & Specs
- Additional Features : Storage
- Is Customizable? : No
- Is Modular : Yes
- Item Firmness Description : Medium
- Seat Cushion Configuration : Multiple Cushion Seat
- Seating Capacity : 5.00
- Weight Capacity Maximum : 1750 Pounds
Item details
- ASIN : B0FTG3Z3N8
- Additional Features : Storage
- Brand Name : Vesgantti
- Collection Name : Vesgantti
- Included Components : Installation Tools, User's Manual
- Indoor Outdoor Usage : Indoor
- Item Type Name : Sofabed
- Manufacturer : Vesgantti
- Manufacturer Part Number : Dreamer Studio
- Model Number : Dreamer Studio
- Orientation : Modular
- Room Type : Bedroom, Living Room
- Seat Cushion Quantity : 5
- Set Name : 5 Seat L-Shape
- Sofa Type : Sofa Bed
- UPC : 840452643529
Materials & Care
- Cushion Construction : High-density foam
- Fill Material : High Density Foam
- Frame Material Type : Wood
- Furniture Leg Material : Wood
- Has Removable Seat Cushion Cover : false
- Material Features : Natural
- Material Type : Wood
- Product Care Instructions : Wipe Clean with Dry Cloth
- Seat Back Fill Material : Foam
- Seat Fill Material : Foam
- Upholstery Fabric Type : Corduroy
Measurements
- Arm Height : 23.2 Inches
- Item Depth : 88 inches
- Item Dimensions : 88 x 88.4 x 35.8 inches
- Item Dimensions D x W x H : 88'D x 88.4'W x 35.8'H
- Item Weight : 97 Pounds
- Size : 5 Seat Sleeper Sofa-88.4' L
Style
- Accent Color : Light Coffee
- Arm Style : Track
- Back Style : Pillow Back
- Color : Light Coffee-pinstripe Corduroy
- Cushion Style : Boxed Edge
- Pattern : Solid
- Shape : L-Shape
- Style Name : Modern
- Upholstery Color : Light Coffee
User guide
- Assembly Instructions Description : This sleeper couch is easy to be assembled by 2 persons, following the detail instructions step by step.
- Component Connector Assembly : Installation Required
- Includes All Assembly Tools : Yes
- Required Assembly : Yes